Chinese English
 The second penang bridge-Package 2 Home - Case - The second penang bridge-Package 2

Project Description

  • The second penang bridge-Package 2:Superstructure works of approach spans-Pipe            MALAYSIA

    Freyssinet - VSL(P2X-PT)Joint Venture                                                                                          Penang

    Jul 2011                                                                                                                                            230 ton

     

     

     

     

     

  • Copyright © 2009 RIMP Mechanical Manufacture (Shenzhen) Co. Ltd All Rights Reserved. ICP 10104789 Home | About | Case | Message | Contact